material handling simulation - P&FDiplift1
  This unit is our highest speed dip lift. Used where a carrier must be moved from an oven to the dip tank quickly, dipped and then moved out of the lift section into a secondary oven. We us a high speed extending grab (moves two and one half times it’s length) to get he carriers from the first oven and latch the carrier into position to be dipped. Once dipped, we employ the use of a “fly-bar” wrapper to rapidly and repeatedly hit the carrier arm so that any excess material is released back into the dip tank. Total cycle time per carrier is sixteen seconds.
home